BPAC Documents
Contents
- Durham Department of Transportation
- BPAC Bylaws
- BPAC Annual Reports
- BPAC Minutes
- BPAC Resolutions
- BPAC Letters
- BPAC Press Releases
- BPAC Interlocal Agreement
- Ordinances
- Transportation Plans
- Transportation Corridor Studies
1. Durham Department of Transportation
Forms and planning documents of the Durham Department of Transportation are posted here.
2. BPAC Bylaws
3. BPAC Annual Reports
- 2009 Annual Report
- 2008 Annual Report
- 2007 Annual Report
- 2006 Annual Report
- 2005 Annual Report
- 2004 Annual Report
4. BPAC Minutes
2010
|
Jan. |
Feb. |
Mar. |
Apr. |
May. |
Jun. |
|
January - Retreat |
2009
|
Jan. (snow cancellation) |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
|
February - Retreat |
2008
|
Jan. |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
|
January - Retreat |
2007
|
Jan. |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
|
March - Retreat |
2006
| Jan. | Feb. | Mar. | Apr. | May | Jun. | Jul. | Aug. | Sep. | Oct. | Nov. | Dec. |
2005
| Jan. | Feb. | Mar. | Apr. | May | Jun. | Jul. | Aug. | Sep. | Oct. | Nov. | Dec. |
2004
| Jan.| Feb.| Mar.| Apr.| May | Jun. | Jul. | Aug.| Sep. | Oct. | Nov. | Dec. |
5. BPAC Resolutions
2008
- Resolution to maintain bicycle and pedestrian access along Maxwell and Sumter Streets., December 16, 2008
2006
- Resolution for Pedestrian Plan Adoption (unsigned copy) , April, 2006
- Connectivity Resolution (unsigned copy) , April 18, 2006
- DOST Open Space Resolution (draft)
6. BPAC Letters
2010
- Letter to NC Representatives & Senators regarding House Bill 1686, Bicycle Safety Changes May 24, 2010
2009
- Letter to Planning Department on Bike Lane Widths along Westpoint on 751 Development., December 16, 2009
- Letter to NC DOT and Durham Transportation Manager on Stimulus Funds and Bicycle Facilities in Durham., December 04, 2009
- Letter to Durham Engineering Manager and Transportation Manager re-design of the Downtown Loop., November 18, 2009
- Letter to Board of Education on School Site Selection and Bicycle/Pedestrian Ammenities at Schools., November 17, 2009
- Letter to Planning Commission on Downtown Zoning and UDO Changes., November 10, 2009
- Response to BPAC Letter on Driveway Standards., October 22, 2009
- Letter to UNC Highway Safety Research Center re: support for NHTSA project on pedestrian safety., July 21, 2009
- Letter to Durham Engineering Manager re: adhering to the adopted Durham Comprehensive Bicycle Transportation Plan and the adopted DurhamWalks! Pedestrian Plan during the re-design of the Downtown Loop., July 21, 2009
- Letter to Durham Public Works re: adhering to the adopted Durham Comprehensive Bicycle Transportation Plan on the Carver Street Extension project., May 20, 2009
- Letter to Durham Transportation Manager re: using Federal stimulus funds for bicycle and pedestrian projects., March 17, 2009
2008
- Letter to Engineering and Stormwater Services re: two-inch lip requirement for driveways., October 10, 2008
- Letter to NCDOT re: bike lanes on Main St. , September 22, 2008
- Letter to Durham Area Transit Authority re: bikes on busses, September 22, 2008
- Letter to 21st Century Commission re: Implementation of Bicycle and Pedestrian Plans, September 24, 2008
- Letter from NC Turnpike Authority re: Triangle Parkway, August 21, 2008
- Letter to Mayor and City Council re: CIP Road Projects, Bicycle and Pedestrian Facilities, and American Tobacco Trail, August 21, 2008
- Letter to Triangle Transportation Authority re: Bicycles on Busses, August 19, 2008
- Letter to Durham Transportation Manager re: Anderson Street, July 25, 2008
- Letter to NC House re: House Bill 2408, allowing wide boat trailers, June 20, 2008
- Letter to NC Turnpike Authority re: Triangle Parkway from NC 540 to I-40, April 7, 2008
- Letter to Mayor and City Council re: Bicycle and Pedestrian Planner Position, March 31, 2008
- Letter to NCDOT re: Hopson Rd Grade Separation of NC Railroad/Norfolk Southern Track, March 31, 2008
- Letter to Mayor and City Council re: Proposed Widening of Alston Ave., March 31, 2008
- Letter from NCDOT re: Hillandale Rd. from I-85 to North of Carver St., March 25, 2008
- Letter to Metropolitan Transportation Advisory Committee re: Priorities for State Ranking, February 13, 2008
- Letter from NCDOT re: South Miami Blvd. from Methodist St. to Bethesda Ave., February 8, 2008
- Letter to NCDOT re: Hillandale Rd. from I-85 to North of Carver St., January 31, 2008
- Letter to Durham City Manager re: Alston Ave Widening , January 24, 2008
2007
- Letter to Durham City Council re: 2008 Two Thirds Bonds, November 30, 2007
- Recommendation to MPO TAC re: STP-DA & CMAQ Projects, October 31, 2007
- Recommendation to MPO TAC re: 2009-2015 TIP Priority Lists, October 23, 2007
- Letter to NCDOT re: Page Branch Creek Trail and South Miami Blvd., October 22, 2007
- Letter to NCDOT Division 5 re: Resurfacing Projects in 2007, April 5, 2007
- Letter to Durham City Council and Durham County Board of Comissioners re: Alston Ave Widening, January 24, 2007
2006
- Letter to NCDOT Division 5 re: Bicycle Planning Course
- Letter to USDOT Secretary Mineta re: TTA Regional Rail,February 5, 2006
- Letter to Mayor Bell re: Eno Trail Priorities ,February 10, 2006
2005
- Letter to Mark Greenspan re: Bike Racks,November 18, 2005
7. BPAC Press Releases
8. BPAC Interlocal Agreement
- Interlocal Cooperation Agreement to Reauthorize the Durham Bicycle and Pedestrian Advisory Commission, February 12, 2010
9. Ordinances
- Ordinance 13428 Amdendment 12 (.doc)
ADA Compliant Sidewalks, American Tobacco Trail Phase-E (bridge at I-40), Bike and Ped projects, Old Lyon Park Center, and more
December 20, 2007.
10. Transportation Plans
Adopted Plans
- 2008 Resurfacing Projects - Durham County (spreadsheet)
- 2008 Resurfacing Projects - Durham County (map)
- NCDOT Resurfacing Guidelines
- Downtown Durham Master Plan (January, 2008)
- 2006 DurhamWalks! Pedestrian Plan
- 2006 Durham Comprehensive Bicycle Transportation Plan
- 2001 Durham Trails & Greenways Master Plan
Plans Under Review
- Duke Central Campus Plan (a work in progress)
- NCCU Master Plan
- B. Everett Jordan Dam and Lake: Master Plan
Transportation Plans & Funding Programs
- 2030 Long Range Transportation Plan (DCHC-MPO)
- 2007-2013 NCDOT Transportation Improvement Program (Division 5)
- 2008-2013 City of Durham Capital Improvements Program
11. Transportation Corridor Studies
- Anderson Street Calming Report, May 8, 2008
- Anderson Street Neckdown Assessment from Chapel Hill Rd. to Moorehead Ave., Feb 19, 2008
- East End Connector - NC 147 to US 70 (Miami Blvd)
- East End Connector - NC 147 to US 70 (Miami Blvd) renderings
- American Tobacco Trail Project - Phase E Pedestrian Bridge Over I-40
- Old Durham-Chapel Hill Road Bicycle and Pedestrian Facilities Study
- NCDOT Presentation on Adding Wide Shoulders to Existing Roads
- NCDOT proposed resurfacing list for 2008 (XLS spreadsheet)
- City of Durham Approved FY 2009 Transportation Projects

